Twelve defects we find in almost every handover

What turns up most often when a new Dubai property is handed over, and the tolerance each one is measured against.

8 min readLast updated 1 August 2026Kensington Inspection Co
British-founded practiceReport delivered immediately on site20 years construction experienceFully licensed★★★★★ 4.9 · 318 client reviews
On this page

These are the defects that turn up most consistently across the properties we inspect at handover. None of them are unusual, and none of them should surprise a developer holding a snagging list. Each is measured, not judged.

Structural & finishes

  1. Wall and ceiling flatness out of tolerance under a straightedge, usually where two trades meet.
  2. Hairline cracking at door reveals and construction joints as the building settles.
  3. Hollow-sounding or uneven tiling, most often on floor thresholds and skirting returns.

Doors, windows & joinery

  1. Doors out of plumb or binding on their frames, particularly on built-in wardrobes.
  2. Window and door seals incomplete, letting in dust or, in exposed units, water.
  3. Kitchen and wardrobe carcasses out of level along a run, visible in inconsistent door gaps.

Wet areas & plumbing

  1. Falls to floor drains too shallow, leaving standing water in showers and balconies.
  2. Low water pressure or flow at outlets furthest from the riser.
  3. Silicone and grout joints incomplete around baths, basins and upstands.

Electrical & lighting

  1. Sockets and switches unwired or wired to the wrong circuit.
  2. Light fittings misaligned with the ceiling layout or missing entirely at handover.
  3. Distribution board unlabelled or mislabelled against the circuits it actually controls.
None of these are rare. What is rare is a buyer who is handed a list of them before they sign for the keys.

What to do when you find one

Photograph it, note where it is, and add it to a single list rather than raising it as a separate complaint. If you are inspecting yourself, work to the same standard the developer's own specification references, usually British tolerances such as NHBC standards or BS 5606, so the finding is a measurement, not an opinion. See our complete guide to snagging for how a full inspection is structured.

Reading a sample defect entry

This is the format every defect in our reports follows: reference, location, severity, the measurement against the tolerance it fails, and the required action. The two entries below are illustrative examples built for this guide, not findings from a real inspection.

SAMPLE-01majorGuest bathroom · Shower enclosure

Floor fall insufficient, water pooling at the drain

Measured
4mm fall over 900mm (illustrative)
Tolerance
Minimum 1:80 fall to floor drain
Standard
NHBC Standards Ch. 8.3 (illustrative)

Required actionIllustrative example. A real entry would set out the correction required and who is responsible for it.

Photo SAMPLE-01SAMPLE-01
SAMPLE-02minorLiving room · Window 2

Seal incomplete at the head of the frame

Measured
Gap of 2mm along 300mm (illustrative)
Tolerance
Continuous seal, no visible gap
Standard
NHBC Standards Ch. 9.2 (illustrative)

Required actionIllustrative example. A real entry would set out the correction required and who is responsible for it.

Photo SAMPLE-02SAMPLE-02
K

Written by the Kensington Inspection Co team

Reviewed for technical accuracy by our technical director, a qualified surveyor. Kensington Inspection Co carries out independent property inspections in Dubai, benchmarked to British surveying standards.

See what a real report looks like

A full sample, with every entry graded and cited exactly as your own report would be.

Measured, not judgedNone of these are rare. Rare is the buyer holding the list before they sign