01
Specification & drawings
Every material, finish and fitting against the schedule you signed and paid for.The finishes in the room against the schedule, including substitutions made on site.
02
Structure & alterations
New openings, lintels, blockwork, and the making good around anything removed.Any wall or opening altered, and the making good around it.
03
Floors, tiling & thresholds
Lippage, hollow beds, grout and silicone lines, junctions between old and new floors.Setting out, cuts at the edges, lippage, grout and silicone lines.
04
Joinery & fitted units
Every run: alignment, closing gaps, soft-close, scribes, and the faces nobody looks at.Alignment, closing gaps, drawer runs, and scribes to wall and ceiling.
05
Paint, plaster & decoration
Flatness under raking light, coverage, cutting-in, edges to trim, glass and ironmongery.Coverage, cutting-in, and the edges where the new work meets the old.
06
Kitchens, bathrooms & sanitaryware
Installation, sealing, isolation, extract, and every appliance tested to specification.Installation, sealing, isolation and extract, with appliances run through a cycle.
07
Electrical, lighting & certification
Every new circuit tested, board relabelled, RCD trips confirmed, certificates issued.New circuits tested, board schedule updated, certificate issued for the alteration.
08
Plumbing, drainage & pressure
Flow and pressure at every outlet, falls, trap seals, isolation valves, concealed runs.Flow and pressure, falls, trap seals and isolation to the fittings installed.
09
HVAC, extract & thermal survey
Relocated grilles, airflow, condensate falls, extract rates, thermal imaging of new wet areas.Airflow and extract in the room, and thermal imaging over new wet areas and chases.